Getting a bespoke build through procurement, venue and brand approval

What procurement, the venue and the brand team each need before a bespoke build can be approved, and the sequence that saves two to three weeks.
— Prop Options

Acrylic, timber, metal or composite: choosing the right material for display

Material choice is a load, handling and lifespan decision, not an aesthetic one. How the four main families actually behave, and the four questions that decide it.
— Prop Options

How to specify a bespoke afternoon tea stand for a hotel

Menu first, then carrying, then cleaning, then storage, and only then design. The decisions that make a signature tea stand work in service.
— Prop Options

What bespoke fabrication costs, and what drives the price

Nobody in this industry publishes prices. Here is the honest version of what actually drives the cost of a bespoke build, in rough order of impact.
— Prop Options

What food safe actually means for hotel and catering display

Food safe applies to contact surfaces, not whole objects. Which materials work, which ones catch people out, and the six questions a buyer should ask a maker.
— Prop Options

How to brief a bespoke fabrication workshop

The six things a workshop needs from you in order to quote properly, what you can safely leave to us, and what a good brief actually looks like.
— Prop Options